The online condition monitoring system of OQ3000CT transformer of Yisi was combined with NARI Group (State Grid Electric Power Research Institute) to conduct pressurization and DGA comparative tests, and the tests achieved the expected results. After the test, both parties reached an in-depth consensus on the follow-up cooperation.